Multi-Criteria Decision Matrix Exercise
In preparation for the 2012 Olympic Games in London, the Olympic Delivery Authority (ODA) faced an unprecedented design challenge: create an 80,000 capacity stadium with the flexibility to be converted to a 25,000 capacity venue after the Games, and do this while achieving the ODA’s sustainability objectives. In the case study below, you’ll discover how they achieved the brief through innovative design and engineering. Furthermore, you’ll use this tool to learn more about how you, too, can make difficult design choices without compromising sustainability. To that end, this tool introduces you to the Multi-Criteria Decision Matrix, or, Values-based Decision Making.